Understanding the factors affecting flashover of a fire in modern buildings
BRE (Building Research Establishment) is an independent, research-based consultancy, testing and training organisation, operating in the built environment and associated industries.
On 21 April 2017, BRE published; Understanding the factors affecting flashover of a fire in modern buildings (IP 2/17), written by Richard Chitty.
- The development of a fire in an enclosure can be categorised as:
- Ignition and growth.
- Fully developed.
- Decay and burnout.
The term ‘flashover’ refers to the transition of an enclosure or room fire from a localised fire to the ignition of all exposed flammable surfaces, creating conditions where life is no longer tenable. The time to flashover is important in determining the impact on; escaping occupants, firefighting tactics and the building structure.
Theoretical and experimental investigations involving flashover have been undertaken since the 1950s. Initially they involved small enclosures and scale models, used to identify the basic mechanisms of flashover in the context of domestic buildings, cellular offices and similar-sized enclosures. While this work is still relevant today for similar enclosures, different mechanisms may also be involved, or become dominant, in particular in very large or highly-insulated modern spaces.
This 12-page information paper explains the process of flashover and the factors that influence its occurrence and development. It is intended for fire risk assessors, fire safety managers, other safety managers and building managers with some responsibility for safety, as well as community fire safety officers, firefighters and fire investigators. It will also be useful for those who are new to fire safety engineering.
The contents of the information paper are:
- Introduction.
- Development of a fire.
- Fires in an enclosure.
- Thermal instability.
- Quantifying the conditions for flashover.
- Example calculations for time to flashover.
- Discussion and conclusions.
- References and further reading.
[edit] Related articles on Designing Buildings Wiki
- Automatic fire detection and alarm systems, an introductory guide to components and systems BR 510.
- Automatic fire sprinkler systems: A good practice guide.
- BRE articles on Designing Buildings Wiki.
- BRE Buzz articles on Designing Buildings Wiki.
- Building Research Establishment BRE.
- External fire spread, Supplementary guidance to BR 187 incorporating probabilistic and time-based approaches.
- External fire spread: building separation and boundary distances (BR 187).
- Fire in buildings.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire spread.
- The causes of false fire alarms in buildings.
- The role of codes, standards and approvals in delivering fire safety.
- Visual alarm devices - their effectiveness in warning of fire.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.